Task: Carry out impact analysis
Evaluation of the change to determine the impact it would have on the development of the item
Purpose
Determines the scope of the proposed change.
Relationships
RolesPrimary Performer: Additional Performers:
InputsMandatory:
    Optional:
    • None
    Outputs
      Main Description

      For each change request an impact analysis must completed to determine the affect of the proposed change on affected interfaces and connected items. The following issues need to be dealt with and answered.

      The type of change request, i.e. error resolution, adaption, enhancement, defect, prevention

      Identification of the work products to be changed and the work products affected. Note. it might be the case that a software issue at the unit level could have impact right up at the stage of the initial hazard analysis and risk assessment phase.

      Potential impact of the change on functional safety

      Schedule for the realization and verification of the change

      Each approved change to the work products shall initiate a return to the applicable phase of the safety lifecycle and subsequent development phases. i.e. the resolution of a change request at the software unit phase of development might require a change at the Hazard Analysis and risk Assessment which will then propagate down through the complete safety lifecycle.